Renewable Energy in Newfoundland & Labrador: 19 Facts, History & More!

Renewable Energy in Newfoundland & Labrador: 19 Facts, History & More!

Key Takeaways

Almost All Renewable: 97.4% of the electricity generated in Newfoundland and Labrador comes from renewable sources, nearly all of it from hydropower [1]

Home of Churchill Falls: The 5,428-megawatt Churchill Falls Generating Station is the province's largest power plant and produces more than 34 terawatt-hours of electricity in an average year [2]

A Historic Opportunity: A new agreement announced in August 2026 would replace the 1969 Churchill Falls contract and support nearly $70 billion in new hydro, wind and transmission projects [3][4][5]. 


Newfoundland and Labrador Renewables Facts History Statistics and More


Did you know that Newfoundland and Labrador generates almost all of its electricity from water? Rivers in Labrador and on the island power homes and businesses across the province, while excess electricity production is sold to Quebec and beyond [1][6].

Not many Canadians know that renewable energy – mainly hydropower – is one of Newfoundland and Labrador’s most important natural resource sub-sectors. The sector supports thousands of jobs and earns critical export revenues, and a new deal for the Churchill River could make it far more valuable for the province in the years ahead.

Below, we explore 19 facts about renewable energy in Newfoundland and Labrador, along with its history and a brief look at what the future holds.


You May Also Be Interested In:


19 Newfoundland & Labrador Renewable Energy Facts

#1 – Newfoundland and Labrador generated 44.3 terawatt-hours (TWh) of electricity in 2023, with 43.1 TWh of it (97.4%) coming from renewable sources [1]

#2 – Hydroelectric stations produced about 42.9 TWh in 2023, or 97% of the province's electricity supply. Wind added 172.3 gigawatt-hours (GWh), or about 0.4%, while biomass added 20.5 GWh [1]

#3 – The province had 8,242 megawatts (MW) of generating capacity in 2023, and 92.9% of it was renewable [1].

#4 – Newfoundland and Labrador’s renewable capacity grew from 6,823 MW in 2010 to 7,655 MW in 2023, mostly thanks to the 824 MW Muskrat Falls Station [1]

#5 – Based on planned additions, Newfoundland and Labrador’s total installed electrical capacity is expected to reach 8,392 MW in 2030, 93% of which will be renewable [1]

#6 – Newfoundland and Labrador Hydro, the province's Crown utility, operates 13 hydroelectric plants with more than 7,280 MW of combined capacity, including Churchill Falls, Muskrat Falls and Menihek in Labrador and 10 stations on the island of Newfoundland [2]

#7 – Churchill Falls has 11 turbines, giving it a rated capacity of 5,428 MW and making it the second-largest underground hydroelectric plant in North America. On average, it generates more than 34 TWh a year [2], equivalent to roughly three-quarters of the 44.3 TWh the whole province generated in 2023 [1].

#8 – Newfoundland and Labrador Hydro owns 65.8% of Churchill Falls, and Hydro-Québec owns the other 34.2%. About 90% of the station's power flows to Quebec and neighbouring markets in Canada and the U.S. through long-term agreements [6].

#9 – Newfoundland and Labrador is a major electricity exporter, with net electricity flows out of the province reaching 34.5 TWh in 2023 [6] – equivalent to about 78% of all the electricity the province generated that year [1]

#10 – The 824 MW Muskrat Falls Generating Station on the lower Churchill River is the province's second-largest hydro plant, which came into service in 2020 [2] and was fully commissioned in late 2021 [6]

#11 – Muskrat Falls power reaches the island through the Labrador-Island Link, a 1,100 km transmission line commissioned in April 2023. The Maritime Link, in service since January 2018, connects the island to Nova Scotia, which receives 20% of Muskrat Falls power under a 35-year agreement [6].

#12 – Newfoundland’s largest hydro plant is Bay d'Espoir, where seven generating units produce 604 MW and about 2,650 GWh per year. Together with Upper Salmon and Granite Canal, the Bay d'Espoir system has 729 MW of capacity [2].

#13 – Newfoundland is home to two 27 MW wind farms at St. Lawrence and Fermeuse, which sell their power to Newfoundland and Labrador Hydro [2]

#14 – From 2019 to 2025, Newfoundland and Labrador Hydro cut fuel use at its Holyrood oil-fired plant by 40% as deliveries from Muskrat Falls increased [7]

#15 – Twenty remote coastal communities across Newfoundland and Labrador are not connected to the main grid and rely on diesel generators [1]

#16 – In August 2026, Newfoundland and Labrador, Quebec and Canada announced a new deal to replace both the 1969 contract and a December 2024 memorandum of understanding. The province values its benefits at $49 billion (2026 net present value), up from $36 billion under the 2024 memorandum [3].

#17 – Under the new Churchill Falls agreement, Newfoundland and Labrador would also keep much more of its own power, rising from 525 MW to 1,630 MW, and its total allocation would reach 2,750 MW once new hydro and wind projects are built [9]

#18 – Upgrades to all 11 turbine-generator units at Churchill Falls would raise the station's capacity by 23.5%, or about 1,275 MW [9][10]

#19 – The federal government has backed the Churchill Falls deal with $10 billion in federal financing, saying that associated projects could add up to nearly $70 billion in investment and 14,000 MW of power, and would support 23,000 jobs and add $31 billion to Canada's GDP through the early 2040s [4]

History of Renewables in Newfoundland & Labrador

Hydroelectricity has been part of life in Newfoundland and Labrador for more than a century, long before Churchill Falls came about.

1900 - On April 19, Newfoundland's first hydroelectric station, at Petty Harbour, sends power to St. John's. It is one of the oldest hydro plants in Canada [11]

1954 - The Menihek hydroelectric station in Labrador is first synchronized, generating 18MW of electrical power sold to Hydro-Québec [2]

1967 - The Bay d'Espoir station comes into service [2]. The same year, construction begins at Churchill Falls, then the largest civil engineering project in North America, with about 6,300 workers [12].

1969 - The Churchill Falls power contract with Hydro-Québec is signed, setting a price of 0.2 cents per kilowatt-hour [3]

1971 - On December 6, Churchill Falls delivers its first power more than 1,200 km to Montreal over 735-kilovolt lines [12]

1980 to 1985 - Hinds Lake, Upper Salmon and Cat Arm come online, adding more hydro to the island grid [2]

2018 - The Maritime Link power transmission line enters service and connects the island's grid to Nova Scotia [6]

2020 - Muskrat Falls, Newfoundland and Labrador’s second largest hydro station by power generating capacity at 824 MW, comes into service on the lower Churchill River [2]

2023 - The Labrador-Island Link transmission line is commissioned, bringing Muskrat Falls power to the island [6]

Future of Renewables in Newfoundland & Labrador

More renewable energy projects are moving through the pipeline in Newfoundland and Labrador. The province’s state hydro company has proposed a 150 MW eighth unit at Bay d'Espoir, which is still under review by the Public Utilities Board [13][14]. North Atlantic tentatively expects to make a final investment decision on its wind-to-hydrogen project in early 2027 [15], and it plans to begin the environmental assessment for a second phase with a 481 MW wind farm [16].

With Churchill Falls, a new deal within reach and more projects in the works, Newfoundland and Labrador is well placed to support its own electricity growth and help power Canada's too. Learn more about Canadian hydropower and Canadian wind power today!

Join Us Today!

Canada needs a stronger economy - banner

Learn more about Canada's energy and natural resource sectors by joining us online. It’s time for action to support Canada’s natural advantage – our energy, forestry, mining, and agriculture sectors – to build a strong and prosperous future for our country.

SOURCES:

1 - https://www.cer-rec.gc.ca/en/data-analysis/energy-markets/renewable-energy-canada/provinces/renewable-power-canada-newfoundland-labrador.html

2 - https://nlhydro.com/about-us/our-electricity-system/our-generation-assets/

3 - https://www.gov.nl.ca/releases/2026/exec/0817n01/

4 - https://www.pm.gc.ca/en/news/news-releases/2026/08/17/prime-minister-carney-announces-largest-clean-energy-investment-north

5 - https://www.cbc.ca/news/canada/newfoundland-labrador/churchill-falls-deal-9.7424782

6 - https://www.cer-rec.gc.ca/en/data-analysis/energy-markets/province-territory-energy-profiles/newfoundland-labrador.html

7 - https://nlhydro.com/newfoundland-and-labrador-hydro-reflects-on-achievements-in-2025-while-preparing-for-the-future-of-electricity-in-the-province/

8 - https://www.gov.nl.ca/em/files/NLHydroAnnualReport2025.pdf

9 - https://www.assembly.nl.ca/business/electronicdocuments/AgreementSummary2026.pdf

10 - https://www.blg.com/en/insights/2026/09/new-churchill-falls-agreement-key-terms

11 - https://www.historicplaces.ca/en/rep-reg/place-lieu.aspx?id=4326&pid=0

12 - https://nlhydro.com/celebrating-50-years-since-the-first-delivery-of-power-at-the-churchill-falls-generating-station/

13 - https://nlhydro.com/about-us/our-electricity-system/major-projects/bay-despoir-hydro-electric-facility-upgrades/

14 - https://nlhydro.com/wp-content/uploads/2026/10/Notice-to-Contractors-OCT2026_V3.pdf

15 - https://www.cbc.ca/news/canada/newfoundland-labrador/north-atlantic-refining-release-9.7212503

16 - https://h2-tech.com/news/2026/07-26/north-atlantic-launches-environmental-assessment-for-phase-2-of-wind-to-hydrogen-project/